Location: Home > Terminology Library  

make-before-break banner

make-before-break

By default, the pole of the MBB(make-before-break, make before break) SPDT switch is connected to NO throw circuit and disconnected from the NC throw circuit. When the make-before-break switch is switched, it will first connect to the NC circuit, and then disconnect to the NO circuit.



  Get in touch with us now!


Please take a minute or two to complete this simple form to get reply in 24 hours, thank you!

*Please check the trash box of your mailbox, if you do not receive our email.